September 22, 2006
 | Added ANSI Welding Standard Z49.1 2005 as a PDF document. All
persons wishing to utilize the facility's welding equipment are required to
pass a simple exam of this material. |
August 4, 2006
 | All Access cards expire and must be renewed on September1, 2006.
Exceptions are for permanent UAH faculty and staff. |
 | Major site content upgrade |
 | Specific changes to Safety and Access sections. Please review. |
January 9th, 2006
 | Revised Access Control Application and Access Control Policy |
 | Revised Syllabus, and Tool List for MAE115 |
October 26th, 2005
 | Made minor changes to the Access Control Card Application |
 | Added "Shop Tour" page. This is just a start. Let us
know what you would like to see here. |
September 19th, 2005
 | Started a fairly major update. New materials include the Access
Control & Monitoring pages, along with the documents required for
access to the facility. All safety related materials, such as the
Safety Contract and safety rules have been evaluated and modified as deemed
necessary. ALL USERS OF THE FACILITY ARE REQUIRED TO READ AND SIGN A
NEW CONTRACT (called the Safety
and Access Agreement) PRIOR TO WORKING IN THE FACILITY. Even if
you have an old contract on file, you must read and sign the new one.
If you wish to use the facility at times other than "Open Shop",
you will also be required to complete an access
control card application. |
 | We are continuing with installation and implementation of the access
control and CCTV monitoring system for the West Wing. As with most
things, this task has turned out to be much more complex and substantial
than anticipated (Rule of pi). The difficulty lies in the
sophistication and integration of the systems as well as trying to account
for the unforeseen. We have bench-tested the systems, developed a
flexible integration plan, and installed the initial battery of
components. These will be evaluated for improvements and modifications
while we continue running the remaining cable and other
infrastructure. |
 | Facilities and Operations have been working hard to complete the
installation of the remaining electrical power, and have finished installing
the main air compressor. We now have building air and have power to
all primary equipment. |
 | I have been told that all of the financial aspects of providing our
computer network for the facility have been worked out, and the installation
is imminent. This is very good news, and long anticipated. |
August 12th, 2005
 | If you are signed up for MAE 115 (or know someone who is) and don't have
an assigned class section, contact me at once. |
 | We have begun installation and implementation of a state-of-the-art access
control and audio / video surveillance system for the West Wing.
Details of the system and it's use will be covered on a separate page linked
here and on the main page. Essentially, anyone desiring to enter the
Facility will require either an access control card / badge, or under some
circumstances may be escorted. Provisions are being made to offer
several orientation sessions at the beginning of each semester to provide
the essential information required to obtain one of these cards. |
 | Continuing to work on electrical power, organization and the many other
tasks required to be ready for Fall. |
June 24th, 2005
 | Renovations to the West Wing are complete and we are starting to move
in. I hope to post some pictures of the space soon, but have been too
busy with the move. |
 | Added the link to the UAH Charger Motorsports Website |
April 6, 2005
 | Added pics of the demolition of the concrete block room. |
March 25, 2005
 | Added several WW renovation pics. The space is really starting to
take shape. |
March 23, 2005
 | Finally got the TL-1 Lathe Post Processor on line |
 | Fixed the problem with the links to the Large pics on the Lathe Tools Pics
Page |
 | Added some interesting external links |
January 28th, 2005
 | Revamp Shopweb with new format |
 | Dr. Wallace does some pretty amazing mods to the TM1 postprocessor,
including a max speed limiter and corresponding feed rate
adjustment. |
January 6th & 7th 2005
 | IPT workshops use shopweb for the first time
Product development process compressed into two 8 hour days |
February 5th 2005
 | Updated TM-1 Tool List (CNC Milling) Still Under construction) |
January 3rd, 2005
 | Shopweb goes up at shopweb.eng.uah.edu